Ballast Deck Bridge at W-265.4 - Tier 2 New Albany IN
Sector: Bridge • Location: New Albany, Indiana, United States of America
Source: Dodge USA
Replace the existing 4 span open deck with a 2 span ballast deck. Remove the existing lead paint bridge Drive HP 14x89 on each abutment to capacity specified in plan Install Socketed HP 14x89 at the intermediate pier Procure and Install prestressed box girders Procure and install all precast pieces including pier caps, wingwalls, and backwalls.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Construction Documents |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Replace the existing 4 span open deck with a 2 span ballast deck. Remove the existing lead paint bridge Drive HP 14x89 on each abutment to capacity specified in plan Install Socketed HP 14x89 at the intermediate pier Procure and Install prestressed box girders Procure and install all precast pieces including pier caps, wingwalls, and backwalls. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
