Ballina Bypass, New South Wales (NSW), Australia

Sector: Bridge • Location: Thailand

Source: Road Traffic Technology

Project
Closed

Ballina Bypass is a 12km long four-way dual carriageway linking the Pacific Highway in North Ballina with the Bruxner Highway Intersection in South Ballina. Image courtesy of Advanstra. The final link from Pacific Highway to the Bruxner Highway was opened in April 2012. The bypass was constructed to reduce traffic congestion levels, improve the road safety and provide easier access to the road for

Project Information FAQ

Project Information

3 Q
The project “Ballina Bypass, New South Wales (NSW), Australia” is an infrastructure initiative in the Bridge sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ballina Bypass is a 12km long four-way dual carriageway linking the Pacific Highway in North Ballina with the Bruxner Highway Intersection in South Ballina. Image courtesy of Advanstra. The final link from Pacific Highway to the Bruxner Highway was opened in April 2012. The bypass was constructed to reduce traffic congestion levels, improve the road safety and provide easier access to the road for local traffic. Image courtesy of Bidgee. Ballina Bypass is a 12km long four-way dual carriageway linking the Pacific Highway in North Ballina with the Bruxner Highway Intersection in South Ballina. It extends from South Ballina to North Tintenbar. The bypass was constructed to reduce traffic congestion levels, improve the road safety and provide easier access to the road for local traffic. The construction was divided into two stages. The first stage consisted of a 5.9km stretch extending from Cumbalum to Ross lane. It was opened to traffic in March 2011. The project was managed by the Australian Government and the New South Wales (NSW) road authority. It is estimated to cost around A$640m and was jointly funded by federal (A$450m) and NSW (A$190m) governments. More than 230 people were recruited for the construction of the bypass. The final link from Pacific Highway to the Bruxner Highway was opened in April 2012 marking the completion of the project. The project received approval from the Australian Government in May 2003. It includes a new 12km carriageway divided into four lanes with a speed limit of 100km/h. The road between the Bruxner Highway and the Teven Road Interchange is divided into six lanes. It involved major construction works at the Bruxner Interchange, Cumbalum Interchange, Teven Road Interchange, Sandy Flat Creek Road and Ross Lane. The project also included alignment of new interchanges at Teven and Ross lane. New bridges were constructed over the Emigrant Creek and Sandy Flat Creeks Road. A total of 19 bridges were constructed across the waterways. The traffic on Bruxner Highway and the Pacific Highway is separated, in order to reduce the traffic congestion and improve safety. The Roads and Traffic Authority (NSW) obtained the contract for the initial works of the Ballina Bypass in August 2006. It formed a consortium, the Ballina Bypass Alliance (BBA), in 2008 for the design and construction of the project. The consortium comprised of Leighton Contractors, Maunsell / AECOM, SMEC and Coffey Geotechnics. The project cost of $640m was funded entirely by the Australian Government in collaboration with the Roads and Traffic Authority (NSW). The minor construction works were initiated in October 2006 and completed by December 2006. They included construction of embankments and the location of the soft soil areas. Major works were initiated in June 2008 and are expected to be completed by mid-2012. The Teven Road roundabout was opened to traffic in May 2011.The construction works at the Ross Lane roundabout are in progress. The construction of culverts beneath the new highway built to the south of the Teven interchange was initiated in May 2011. The Cumbalum to Teven Road section was opened in November 2011. Southward lanes from Teven to Bruxner were opened December 2011, while northward lanes opened in February 2012. The piling works for the McLeay bridge platform were initiated in June 2011. Other works, which were carried out in June 2011, included landscaping and pavement works at the Teven Road Bridge, road widening at Bruxner Highway and pavement works at Emigrant Creek Bridge. A single span bridge was constructed over the Tamarind drive adjacent to the Pacific Highway. A small bridge was constructed over the Dead Man’s Creek adjacent to the old Pacific Highway. Construction of all the new bridges on the new alignment of the Pacific Highway was completed by August 2011. Construction works on the Cumbalum flood relief bridges were completed in February 2011. Construction works on the western roundabout were completed in September 2011. Other works include demolition of the concrete plant at Tintenbar and management of the soft soils at the site. The construction required approximately 1.7 million cubic metres of earthwork and 100,000 cubic metres of concrete. The Lane Cove Tunnel is a key link in Sydney’s orbital motorway network, connecting the Gore Hill Freeway with the M2. It provides quicker journey times between the City and Sydney’s fast-developing north-west. The 40km Westlink M7 (previously known as the Western Sydney Orbital) is Australia’s biggest urban road project. The road was delivered as a Build / Own / Operate / Transfer (BOOT) scheme.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data