logo

Ballyteige Solar PV Portfolio

Sector: Solar • Location: Ireland

Source: Solar Power Portal

Project
Planned

The Ballyteige portfolio consists of two solar PV power plants with a combined capacity of 115MWp, located in County Offaly. This portfolio is also in the pre-construction phase and has secured grid connection permits, with construction expected to begin in 2027.

Status
Prospective
Sector
Solar, Power Generation (CCGT)
Location
Ireland
Updated
22 Jul 2026
Source
Solar Power Portal

ConstructChat

Ask ConstructChat about Ballyteige Solar PV Portfolio

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ballyteige Solar PV Portfolio” is an infrastructure initiative in the Solar sector, located in Ireland. Taiyo aggregates data on it from Solar Power Portal.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ballyteige portfolio consists of two solar PV power plants with a combined capacity of 115MWp, located in County Offaly. This portfolio is also in the pre-construction phase and has secured grid connection permits, with construction expected to begin in 2027.

Original sector

Energy

Location

Country

Ireland

Source

Source

Solar Power Portal

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project