logo
ProjectPlanned

Balti-Suceava Power Line Construction

Planned · Republic of Moldova · Last reported Jul 2025

Source: Cotidianul

The project involves the construction of a new power line from Balti to Suceava, with an estimated length of about 48 km crossing 12 localities in Moldova. It includes the installation of 145 metal poles and aims to enhance the energy system's stability and integration with the European energy network.

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT), Metal, Government
Location
Balti, Moldova
Updated
22 Jul 2026
Source
Cotidianul

ConstructChat

Ask ConstructChat about Balti-Suceava Power Line Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Balti-Suceava Power Line Construction” is an infrastructure initiative in the Power Transmission sector, located in Balti, Republic of Moldova. Taiyo aggregates data on it from Cotidianul.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of a new power line from Balti to Suceava, with an estimated length of about 48 km crossing 12 localities in Moldova. It includes the installation of 145 metal poles and aims to enhance the energy system's stability and integration with the European energy network.

Original sector

Energy

Budget

Location

Country

Moldova

City

Balti

Source

Source

Cotidianul

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Metal, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project