BalWin1 Offshore Wind Grid Connection System
Planned · Germany · Last reported Feb 2025
Source: Offshore magazine
Aker Solutions has signed a contract with Dragados Offshore to deliver the steel substructure for the 2-GW HVDC converter station for the BalWin1 offshore wind grid connection system in Germany. The project includes an option for the BalWin 2 steel substructure, with fabrication set to begin early next year and deliveries expected in 2028 and 2029.
- Status
- Prospective
- Sector
- Wind, Manufacturing (Industrial), Metal, Steel
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- Offshore magazine
ConstructChat
Ask ConstructChat about BalWin1 Offshore Wind Grid Connection System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Aker Solutions has signed a contract with Dragados Offshore to deliver the steel substructure for the 2-GW HVDC converter station for the BalWin1 offshore wind grid connection system in Germany. The project includes an option for the BalWin 2 steel substructure, with fabrication set to begin early next year and deliveries expected in 2028 and 2029. |
Original sector | Renewable Energy |
Location
Country | Germany |
Source
Source | Offshore magazine |
URL |
More Details
Record type | Project |
Sector | Wind, Manufacturing (Industrial), Metal, Steel |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
