BalWin5 HVDC Offshore Wind Connection
Sector: Power Generation (CCGT) • Location: Netherlands
Source: Fortune
Seatrium and GE Vernova won a contract from Dutch transmission operator TenneT to deliver BalWin5, a 2.2-gigawatt high-voltage direct-current (HVDC) connection linking North Sea wind farms to Germany’s onshore power grid. The project is expected to be commissioned in 2032 and will power roughly 2.75 million households.
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Wind
- Location
- Netherlands
- Updated
- 22 Jul 2026
- Source
- Fortune
ConstructChat
Ask ConstructChat about BalWin5 HVDC Offshore Wind Connection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Seatrium and GE Vernova won a contract from Dutch transmission operator TenneT to deliver BalWin5, a 2.2-gigawatt high-voltage direct-current (HVDC) connection linking North Sea wind farms to Germany’s onshore power grid. The project is expected to be commissioned in 2032 and will power roughly 2.75 million households. |
Original sector | Energy |
Location
Country | Netherlands |
Source
Source | Fortune |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Wind |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
