logo

Bamako Urban Resilience project

Sector: Water Supply and Storage • Location: Mali

Source: World Bank

Project
Active

This operation covers both the CERC restructuring and the AF to replenish the components that finance the CERC activities. The project is restructured through the reallocation of fund to the CERC component from undisbursed proceeds of the project to address the flood response needs. Through this AF, financing will be provided back to most of the components that are financing the flood emergency r

Project Information FAQ

Project Information

5 Q
The project “Bamako Urban Resilience project” is an infrastructure initiative in the Water Supply and Storage sector, located in Mali. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This operation covers both the CERC restructuring and the AF to replenish the components that finance the CERC activities. The project is restructured through the reallocation of fund to the CERC component from undisbursed proceeds of the project to address the flood response needs. Through this AF, financing will be provided back to most of the components that are financing the flood emergency response interventions under the CERC. The proposed US$50 million AF will allow PRUBA to partially replenish the CERC-related funds and to keep most of all initially designed activities. The proposed changes cover: (i) a change to the PDO to reflect the CERC activation; (ii) changes in component costs; (iii) update of the Results Framework to introduce new indicators and targets related to the CERC activation; and (iv) reallocation of funds between disbursement categories in the original IDA grant. The closing date of the Project will remain unchanged. The Project will maintain the existing six components and all original subcomponents. The Project Restructuring will formalize the reallocation of US$73 million from Component 1 (US$40 million), 3 (US$20m) and 4 (US$13m) – all under disbursement category 1 - to Component 6 (Contingency Emergency Response Component, category 6). The AF will fully replenish Component 3 (with US$20m) and partially replenish Component 1 (with US$29m) and add US$1m to finance additional management costs including recruitments to support the PRUBA PMU under Component 5 - Project management and monitoring.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data