logo
ProjectTender Publish

Bamore Decentralized Ground Mounted Solar Power Project

Sector: Power Generation (CCGT) • Location: Jhansi, Uttar Pradesh, India

Source: India Investment Grid (IIG)

Information Uttar Pradesh New and Renewable Energy Development Agency has come up with Bamore Decentralized Ground Mounted Solar Power Project with a ticket size of 0.0 INR Crores. This project in Electricity Generation [Renewable] sub-sector involves Setting up of Energy Power Plant The current status of the project is Tender Published and is being developed through the EPC route.

Status
Prospective
Sector
Power Generation (CCGT), Road, Solar, Government
Location
Jhansi, Uttar Pradesh, India
Updated
19 Nov 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Bamore Decentralized Ground Mounted Solar Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bamore Decentralized Ground Mounted Solar Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Jhansi, Uttar Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

tender publish

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Information Uttar Pradesh New and Renewable Energy Development Agency has come up with Bamore Decentralized Ground Mounted Solar Power Project with a ticket size of 0.0 INR Crores. This project in Electricity Generation [Renewable] sub-sector involves Setting up of Energy Power Plant The current status of the project is Tender Published and is being developed through the EPC route.

Original sector

Electricity Generation

Location

Country

India

State

Uttar Pradesh

City

Jhansi

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Road, Solar, Government

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project