BAN CHAO NEN HYDROEL
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project would provide construction of hydroelectric facilities at Ban Chao Nen on the Quae Yai river, consisting of a dam, about 140km high and 615m long, a reservoir with an effective storage capacity of 4,400 million cubic meters, hydraulic structures, electro-mechanical equipment with a capacity of 360MW and transmission facilities. It also would provide for resettlement of about 8,000 peop
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BAN CHAO NEN HYDROEL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would provide construction of hydroelectric facilities at Ban Chao Nen on the Quae Yai river, consisting of a dam, about 140km high and 615m long, a reservoir with an effective storage capacity of 4,400 million cubic meters, hydraulic structures, electro-mechanical equipment with a capacity of 360MW and transmission facilities. It also would provide for resettlement of about 8,000 people who now inhabit the area which will be flooded. Bank financing would provide: the main civil works; and construction equipment required by EGAT to carry out the preliminary works and resettlement. OECF financing would provide: hydraulic equipment; electro-mechanical equipment; transmission lines and sub-stations; and engineering consulting services. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
