logo
ProjectPlanned

Banandra Wind Project

Planned · New South Wales · Last reported Jul 2026

Source: Renew Economy

The Banandra wind project is a 558 MW wind farm proposed by Squadron Energy, located on 11,600 hectares of mostly grazing land south-east of Darlington Point, New South Wales. The project includes 90 turbines with a tip height of around 270m, designed with 2km setbacks from homes. It aims to connect to the existing 330 kV line between Darlington Point and Wagga Wagga. The project is in early devel

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT)
Location
Darlington Point, New South Wales, Australia
Updated
19 Nov 2026
Source
Renew Economy

ConstructChat

Ask ConstructChat about Banandra Wind Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Banandra Wind Project” is an infrastructure initiative in the Wind sector, located in Darlington Point, New South Wales, Australia. Taiyo aggregates data on it from Renew Economy.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Banandra wind project is a 558 MW wind farm proposed by Squadron Energy, located on 11,600 hectares of mostly grazing land south-east of Darlington Point, New South Wales. The project includes 90 turbines with a tip height of around 270m, designed with 2km setbacks from homes. It aims to connect to the existing 330 kV line between Darlington Point and Wagga Wagga. The project is in early development stages with community consultation started in May 2026, and planning application and EPBC referral lodged in July 2026. Squadron plans to complete planning by 2029, start construction in 2030, and reach full power by 2032.

Original sector

Renewables

Location

Country

Australia

State

New South Wales

City

Darlington Point

Source

Source

Renew Economy

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT)

Article published date

2026-07-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project