logo

Band Office Energy Efficiency Upgrades

Sector: Commercial • Location: Miramichi, New Brunswick, Canada

Source: Dodge USA

Project
Gc Bidding

The Work consists generally of construction of: - Building envelope upgrades, including removal disposal and replacement of: cladding, air barrier, rigid installation, soffit, facia, mechanical louvers, windows and main entrance system and installation of metal roofing system, eaves trough and snow restraint system; - Replacement of lighting fixtures with LED including interior, exterior and emerg

Status
Prospective
Sector
Commercial, Metal, Residential, Road
Location
Miramichi, New Brunswick, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Band Office Energy Efficiency Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Band Office Energy Efficiency Upgrades” is an infrastructure initiative in the Commercial sector, located in Miramichi, New Brunswick, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

gc bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work consists generally of construction of: - Building envelope upgrades, including removal disposal and replacement of: cladding, air barrier, rigid installation, soffit, facia, mechanical louvers, windows and main entrance system and installation of metal roofing system, eaves trough and snow restraint system; - Replacement of lighting fixtures with LED including interior, exterior and emergency lighting; and - Optional work, including replacement of a 15 TonR and 10TonR split heat pump...

Procurement method

Location

Country

Canada

State

New Brunswick

City

Miramichi

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Metal, Residential, Road

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project