Banda Gas to Power Guarantee
Closed · Mauritania
Source: World Bank Group
The development objective of the Banda Gas to Power Project for Mauritania, Senegal, Mali is to enable production of natural gas for generation of electricity to reduce the cost and increase the supply for Mauritanian households and industry, and enable regional integration through exports of electric power from Mauritania to Senegal and Mali. The project comprises of three components. The first c
- Status
- Closed
- Sector
- Power Generation (CCGT), Oil and Gas, Natural Gas, Government
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Banda Gas to Power Guarantee
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Banda Gas to Power Project for Mauritania, Senegal, Mali is to enable production of natural gas for generation of electricity to reduce the cost and increase the supply for Mauritanian households and industry, and enable regional integration through exports of electric power from Mauritania to Senegal and Mali. The project comprises of three components. The first component, the upstream Banda offshore gas field production, transmission, and processing infrastructure (the Banda Gas Project) consists of two sub-sea wells tied back to an onshore gas processing plant via a subsea production manifold and a 10-inch sub-sea pipeline. The second component, power generation from Banda gas in Mauritania (the societe de production d'electricite a partir du gaz (SPEG Power Project) is designed to be implemented in two phases to match the evolution of electricity demand in Mauritania (and the region) and optimize capital allocation. The third component is providing existing and new power transmission lines to evacuate power to the delivery points. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Mauritania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Natural Gas, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Mauritania
- Banda Gas-to-Power Project (Upstream)
- SNIM VII
- Mauritania - Nouakchott City "Aftout Essahli" Drinking Water Supply Project
- Mauritania – Desert To Power : RIMDIR1 – Green Mini-Grid Electrication Project
- Emiral Resources Gold Exploration
- BirAllah Gas Field Development
- BirAllah Gas Development Project
- BirAllah LNG Project
