Banda Gas-to-Power Project
Sector: Natural Gas • Location: Mauritania
Source: Energy Capital & Power
The Banda gas-to-power project is Mauritania's inaugural 300 MW combined cycle plant that will replace heavy fuel oil with natural gas from the Banda field to generate more than 150 MW of electricity. The project includes downstream gas distribution in the form of mobile LNG to support industrial and mining sectors.
- Status
- Prospective
- Sector
- Natural Gas, Manufacturing (Industrial), Power Generation (CCGT), LNG, Oil and Gas
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- Energy Capital & Power
ConstructChat
Ask ConstructChat about Banda Gas-to-Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Banda gas-to-power project is Mauritania's inaugural 300 MW combined cycle plant that will replace heavy fuel oil with natural gas from the Banda field to generate more than 150 MW of electricity. The project includes downstream gas distribution in the form of mobile LNG to support industrial and mining sectors. |
Original sector | Energy |
Location
Country | Mauritania |
Source
Source | Energy Capital & Power |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Manufacturing (Industrial), Power Generation (CCGT), LNG, Oil and Gas |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
