Bandini Boulevard Street Improvements
Sector: Water Supply and Storage • Location: Los Angeles, California, United States of America
Source: Dodge
Street improvements on Bandini Boulevard between Downey Road and Indiana Street. Improvements include but are not limited: asphalt grind and overlay; concrete pavement removal and improvements; curb ramp upgrades; striping; manhole adjustments; utility valve cover adjustments; curb and gutter replacement; sidewalk replacement; driveway approach replacement; traffic control; survey monument preserv
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Power Transmission, Rail, Waste Processing and Treatment, Cement, Commercial, Power Generation (CCGT), Car parking, Automotive
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bandini Boulevard Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Street improvements on Bandini Boulevard between Downey Road and Indiana Street. Improvements include but are not limited: asphalt grind and overlay; concrete pavement removal and improvements; curb ramp upgrades; striping; manhole adjustments; utility valve cover adjustments; curb and gutter replacement; sidewalk replacement; driveway approach replacement; traffic control; survey monument preservation/restoration; and coordination with railroad agencies. The work shall be done in accordance ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Power Transmission, Rail, Waste Processing and Treatment, Cement, Commercial, Power Generation (CCGT), Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
