The project comprises: (a) land procurement and site development of a power station that will ultimately consist of four units of 500 MW capacity each; (b) construction of civil works including power plant structures and buildings, fuel supply handling and storage systems, water cooling systems, makeup water, etc.; (c) supply and installation of the boiler, turbogenerator, auxiliary electrical, me
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Geothermal, Cement, Commercial, Government
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BANG PAKONG THERMAL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises: (a) land procurement and site development of a power station that will ultimately consist of four units of 500 MW capacity each; (b) construction of civil works including power plant structures and buildings, fuel supply handling and storage systems, water cooling systems, makeup water, etc.; (c) supply and installation of the boiler, turbogenerator, auxiliary electrical, mechanical and miscellaneous equipment for the first 500 MW generating unit; (d) construction of 230 kV switchyard at Bang Pakong and substations at Rangsit and Bang Kapi and 110 km of 230-kV transmission lines linking Bang Pakong power station to the EGAT grid; (e) supply of construction equipment (hoists, cranes, welding equipment, earth movers, concrete mixers, etc.); (f) engineering services; and (g) a study of future generation and transmission projects. The project will help meet the country's growing electricity demand including that of the accelerated rural electrification program. There are no risks considered significant enough to preclude preceeding with the project. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Geothermal, Cement, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project