BANGCHAK SOLAR POWER PROJECT
The status, timeline and source of this project. A free account opens every field.
Source: Asian Development Bank (ADB)
The project involves construction of 2 solar power generation plants, a smaller 8 MW plant (net capacity with Provincial Electricity Authority offtake) and a larger 30 MW plant (net capacity with Electricity Generating Authority of Thailand offtake) in the Ayutthaya Province. The first plant has a gross capacity of 10 MW and will operate under the Very Small Power Producer (VSPP) program and the s
- Sector
- Solar, Oil and Gas, Power Generation (CCGT), Government
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about BANGCHAK SOLAR POWER PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves construction of 2 solar power generation plants, a smaller 8 MW plant (net capacity with Provincial Electricity Authority offtake) and a larger 30 MW plant (net capacity with Electricity Generating Authority of Thailand offtake) in the Ayutthaya Province. The first plant has a gross capacity of 10 MW and will operate under the Very Small Power Producer (VSPP) program and the second plant has a gross capacity 34.5 MW and will operate under the Small Power Producer (SPP) program. The site has approximately 480 rai (76.8 hectares) of relatively flat land. The two plants are being implemented under a 5-year automatically renewable (on a continual basis) Power Purchase Agreement (PPA) with the Electricity Generating Authority of Thailand (EGAT) under the SPP and with the Provincial Electricity Authority (PEA) under the VSPP programs. |
Original sector | Energy |
Location
Country | Thailand |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Solar, Oil and Gas, Power Generation (CCGT), Government |
Article published date | 2024-12-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
