Bangka Power Plant
Sector: Power Transmission • Location: Indonesia
Source: World Bank Group
PT Bangka Manunggal Power started to develop the Bangka Power Plant, a (2 X 12 MW) coal-fired power plant in 2007. The plant was to supply electricity to the state-owned electrical utility, PT PLN, under a 25-year power purchase agreement (PPA). The greenfield power plant was developed on a build, own and operate basis in Airanyir village, Merawang, Bangka-Belitung province. The power project was
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | PT Bangka Manunggal Power started to develop the Bangka Power Plant, a (2 X 12 MW) coal-fired power plant in 2007. The plant was to supply electricity to the state-owned electrical utility, PT PLN, under a 25-year power purchase agreement (PPA). The greenfield power plant was developed on a build, own and operate basis in Airanyir village, Merawang, Bangka-Belitung province. The power project was conceived as part of PT PLN’s efforts to overcome a power shortage in Bangka. The contract was awarded on March 21, 2007, when the project company and PT PLN signed a 25-year power purchase agreement (PPA). Information on the method of contract award was not publicly available. Under the terms of the PPA, PT PLN agreed to purchase electricity from the plant at a rate of US$0.049 (448.15 Indonesian Rupiah [IDR]) per KWh. The project company, PT Bangka Manunggal Power, was a wholly owned subsidiary of PT Truba Alam Manunggal Engineering Tbk., a private company. The project reached financial closure in May 2008 with the conclusion of a US$12.2 million (IDR 118 billion) loan agreement between the project company and Bank Bukopin. The total investment commitment for the 24 MW project was US$22.5 million (IDR 218.5 billion). PT Truba Jaya Engineering (TJE) an indirect wholly-owned subsidiary of PT Truba Alam Manunggal Engineering was appointed as the contractor for the Engineering, Procurement, and Construction (EPC) of the Bangka power plant. The sponsor expected the power plant to begin commercial operation in September 2009. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |