logo

Bangka Power Plant

Sector: Commercial • Location: Banten, Indonesia

Source: World Bank Group

Project
Active

PT Bangka Manunggal Power started to develop the Bangka Power Plant, a (2 X 12 MW) coal-fired power plant in 2007. The plant was to supply electricity to the state-owned electrical utility, PT PLN, under a 25-year power purchase agreement (PPA). The greenfield power plant was developed on a build, own and operate basis in Airanyir village, Merawang, Bangka-Belitung province. The power project was

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Power Transmission, Government
Location
Banten, Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bangka Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bangka Power Plant” is an infrastructure initiative in the Commercial sector, located in Banten, Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PT Bangka Manunggal Power started to develop the Bangka Power Plant, a (2 X 12 MW) coal-fired power plant in 2007. The plant was to supply electricity to the state-owned electrical utility, PT PLN, under a 25-year power purchase agreement (PPA). The greenfield power plant was developed on a build, own and operate basis in Airanyir village, Merawang, Bangka-Belitung province. The power project was conceived as part of PT PLN’s efforts to overcome a power shortage in Bangka. The contract was awarded on March 21, 2007, when the project company and PT PLN signed a 25-year power purchase agreement (PPA). Information on the method of contract award was not publicly available. Under the terms of the PPA, PT PLN agreed to purchase electricity from the plant at a rate of US$0.049 (448.15 Indonesian Rupiah [IDR]) per KWh. The project company, PT Bangka Manunggal Power, was a wholly owned subsidiary of PT Truba Alam Manunggal Engineering Tbk., a private company. The project reached financial closure in May 2008 with the conclusion of a US$12.2 million (IDR 118 billion) loan agreement between the project company and Bank Bukopin. The total investment commitment for the 24 MW project was US$22.5 million (IDR 218.5 billion). PT Truba Jaya Engineering (TJE) an indirect wholly-owned subsidiary of PT Truba Alam Manunggal Engineering was appointed as the contractor for the Engineering, Procurement, and Construction (EPC) of the Bangka power plant. The sponsor expected the power plant to begin commercial operation in September 2009.

Original sector

Energy

Budget

Location

Country

Indonesia

State

Banten

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Power Transmission, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project