Bangkok Mass Rapid Transit Project (Pink and Yellow Lines)
Sector: Mass Transit • Location: Thailand
Source: Asian Development Bank (ADB)
The Thai government approved the implementation of PPP Net Cost scheme for the monorail system of the MRT Pink Line and Yellow Line projects in Bangkok in March 2016, in which the Mass Rapid Transit Authority of Thailand (MRTA) will be responsible for provision of the land and the right of way whereas the private sector will invest in all civil works, M&E systems, and rolling stocks, including ope
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Thai government approved the implementation of PPP Net Cost scheme for the monorail system of the MRT Pink Line and Yellow Line projects in Bangkok in March 2016, in which the Mass Rapid Transit Authority of Thailand (MRTA) will be responsible for provision of the land and the right of way whereas the private sector will invest in all civil works, M&E systems, and rolling stocks, including operations & maintenance services. The two projects are feeder lines to diversify the transport modality of the city, and to feed passengers to the main MRT lines, in particular those that connect to Bangkok CBD. The projects will mitigate traffic congestion and associated environmental issues, provide convenient and cost-effective public transportation system, and reduce the government's fiscal burden. The projects are parts of the government's stimulus measures to improve infrastructure which is an essential part of the country's sustainable development. The MRTA announced invitations for tender of the MRT Pink Line and Yellow Line projects in July 2016. Although the tender process was undertaken separately for the two lines, the BSR Joint Venture (BSR) submitted the most competitive proposal and was selected as the preferred bidder for both lines in December 2016. BSR has entered into the concession agreements with MRTA for the MRT Pink Line and Yellow Line projects, respectively, in June 2017. Under the concession, BSR will obtain the rights to operate the lines, and be entitled to receive farebox revenues, commercial development fees, and parking fees during the concession period. BSR comprises BTS Group Holdings Public Company Limited (BTS Group), the market leader in mass transit business, operating existing Green line, Sino-Thai Engineering and Construction Public Company Limited (Sino-Thai), major construction company, and Ratchaburi Electricity Generating Holding Public Company Limited (Ratchaburi Electricity), one of the largest energy investment company. The MRT Pink Line will operate between Min Buri district (Bangkok) and Khae Rai (Nonthaburi province), it will connect with existing MRT lines (e.g. Purple Line, Green Line), and new MRT lines (e.g. Red Line, Orange Line). The entire route length is about 34.5 kilometers, and the project components include 30 stations, one depot and stabling yard, and one park & ride building. The MRT Yellow line will operate between Lat Phrao (Bangkok) and Samrong (Sumut Prakarn province), it will connect with existing MRT lines (e.g. Green Line, Airport Rail Link), and new MRT lines (e.g. Blue Line, Orange Line). The entire route length is about 30 km., with 23 stations, one depot, and one park & ride building. The government will provide subsidies during the first 10 years of the operation when the ridership is most uncertain. To further mitigate the ridership risk, ADB will extend a loan tranche whose door-to-door tenor is longer than the commercial banks to reduce the annual schedule repayment amount during the period following the expiry of the government subsidies. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Mass Transit projects in Thailand
- The Bridge on the River Kwai
- Chembarambakkam Water Treatment Plant
- Lions Gate Secondary Wastewater Treatment Plant, Vancouver
- Kitchener Wastewater Treatment Plant Upgrades, Region of Waterloo, Ontario
- Kamov Ka-32A
- Skangas LNG Import Terminal, Port of Tahkoluoto, Pori
- TransCanada’s Gulf Coast Pipeline Project, US
- Slovak-Hungarian Gas Interconnector, Slovakia
