Bangladesh: Bangladesh Bhola IPP

Sector: Water Supply and Storage • Location: Bangladesh

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The project will be developed by Shapoorji Pallonji Infrastructure Capital Company Private Limited through Nutan Bidyut (Bangladesh) Limited (NBBL), a special purpose vehicle incorporated in Bangladesh for the sole purpose of developing and operating the project. The 220 MW power plant will include two gas turbine generators, two heat recovery steam generators and one steam turbine generator along

Project Information FAQ

Project Information

5 Q
The project “Bangladesh: Bangladesh Bhola IPP” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will be developed by Shapoorji Pallonji Infrastructure Capital Company Private Limited through Nutan Bidyut (Bangladesh) Limited (NBBL), a special purpose vehicle incorporated in Bangladesh for the sole purpose of developing and operating the project. The 220 MW power plant will include two gas turbine generators, two heat recovery steam generators and one steam turbine generator along with the balance of the plant, including facilities for fuel gas transportation, compression and conditioning system, high-speed diesel storage, cooling water system and water treatment facility. Power will be evacuated through the proposed gas insulated switchyard of the proposed plant to the existing 230 kV air insulated switchyard to Barisal substation through the existing 230 kV transmission line. A gas pipeline of around 5 kilometers from the Shahbazpur gas field to the project site alongside the existing pipeline will be constructed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data