logo

Bangladesh: Electricity Distribution Modernization (Chattogram and Sylhet Divisions) Project

Sector: Water Supply and Storage • Location: Bangladesh

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

Bangladesh Rural Electrification Board (BREB), one of the major state-owned entities in the energy sector in Bangladesh, is responsible for extending electricity distribution services to the rural areas of the country. The entity, through its 80 “Palli Bidyut Samities” (PBSs) (i.e., rural electricity clusters) organized under eight divisions, collectively serves more than 75 percent of the country

Project Information FAQ

Project Information

5 Q
The project “Bangladesh: Electricity Distribution Modernization (Chattogram and Sylhet Divisions) Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bangladesh Rural Electrification Board (BREB), one of the major state-owned entities in the energy sector in Bangladesh, is responsible for extending electricity distribution services to the rural areas of the country. The entity, through its 80 “Palli Bidyut Samities” (PBSs) (i.e., rural electricity clusters) organized under eight divisions, collectively serves more than 75 percent of the country's electricity consumers. Out of 80 PBSs, Chattogram and Sylhet divisions have 19 PBSs that provide services to around 9.2 million consumers (including industrial and commercial users). In 2022, the Government of Bangladesh (GoB) announced the policy goal of universal access to electricity in the country. Since then, electricity demand for both domestic and industrial sectors have been on the rise. Chattogram and Sylhet divisions have developed socio-economically at an accelerated pace in the last 15 years. GoB has targeted developing multiple mega infrastructure projects in the Chattogram division and is expanding industrial opportunities in the Sylhet division. BREB anticipates an increase in consumer demand for reliable electricity supply in these two divisions. To (i) meet the expected additional demand, (ii) decongest the network, and (iii) reduce the distribution losses, BREB has initiated this project to increase the capacity of and modernize the distribution network. The following activities are planned in the project scope: Installation and augmentation of 33/11 kilovolt (kV) substations with a total capacity of approximately 2,062 megavolt-amperes (MVA); Construction and modernization of around 30,000 kilometers (km) of 33/11 kV distribution lines; and Installation of River-crossing Towers, Switching Stations, Supervisory Control and Data Acquisition (SCADA) System, and Fault Locators in selected areas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data