The development objective of the Ghorashal Unit Four Repowering Project is to increase generation capacity and efficiency of the targeted power plant. There are two components to the project, the first component being re-powering of the target unit. His component will finance all the required plant equipment and auxiliaries, design and installations services for the full repowering of unit four. T

Project Information FAQ

Project Information

5 Q
The project “Bangladesh Ghorashal Unit 4 Repowering Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Ghorashal Unit Four Repowering Project is to increase generation capacity and efficiency of the targeted power plant. There are two components to the project, the first component being re-powering of the target unit. His component will finance all the required plant equipment and auxiliaries, design and installations services for the full repowering of unit four. The major plant equipment include a new Gas Turbine and Generator (GTG), a Heat Recovery Steam Generator (HRSG), Distributed Control System (DCS), gas booster compressor, main stack, bypass stack and all other associated ancillary equipment. The works will include complete overhauling of the existing ST generator, replacement and modernization of the existing auxiliaries, rehabilitation and modernization of existing cooling towers and workshop buildings, construction of a regulatory metering station (RMS), dismantling of the existing boiler, and construction of residential and non-residential buildings. Finally, the second component is the technical assistance for institutional strengthening support. This component would finance an owner’s Engineer (implementation support consultant) for the Project to bolster project governance while ensuring effective management, monitoring and quality assurance of the design, engineering and construction and the initial operation of the repowered plant. This component would also focus on capacity building and institutional support to operate the plant effectively and efficiently as well as support BPDB to help strengthen its technical and managerial capacity to plan, develop and operate its generation portfolio.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data