logo
ProjectApproved

Bangladesh: Power System Upgrade and Expansion

One of 10,000+ projects Taiyo tracks in Bangladesh.

Source: Asian Infrastructure Investment Bank (AIIB)

The project will construct 53 km of 400 kV and 230 kV double-circuit transmission lines and associated substations and line bays in the Chattogram region. This will collectively provide 1,400 megavolt-ampere (MVA) transmission capacity at different voltage levels.

Status
Prospective
Sector
Government, Power Generation (CCGT)
Location
Bangladesh
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Bangladesh: Power System Upgrade and Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bangladesh: Power System Upgrade and Expansion” is an infrastructure initiative in the Government sector, located in Bangladesh. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will construct 53 km of 400 kV and 230 kV double-circuit transmission lines and associated substations and line bays in the Chattogram region. This will collectively provide 1,400 megavolt-ampere (MVA) transmission capacity at different voltage levels.

Original sector

Energy

Budget

Location

Country

Bangladesh

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT)

Article published date

2025-09-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project