Bangladesh: Southern Chattogram and Kaliakoir Transmission Infrastructure Development Project

Approved · Bangladesh

Source: Asian Infrastructure Investment Bank (AIIB)

The project comprises the construction of around 180.43 kilometers (km) 132/230kV transmission line, four gas-insulated switchgear (GIS) substations, and two bay extensions in Southern Chattogram region (i.e., Anwara, Cox's Bazar, Teknaf) of Chattogram division, and Kaliakoir region (Bangabandhu Hi-Tech City (BHTC)) in Gazipur district of Dhaka division. The Government of Bangladesh (GoB) has unde

Status
Prospective
Sector
Water Supply and Storage, Government, Consumer Products, Biomass, Raw Materials, Residential, Road, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Power Transmission, Automotive
Location
Bangladesh
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Bangladesh: Southern Chattogram and Kaliakoir Transmission Infrastructure Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bangladesh: Southern Chattogram and Kaliakoir Transmission Infrastructure Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprises the construction of around 180.43 kilometers (km) 132/230kV transmission line, four gas-insulated switchgear (GIS) substations, and two bay extensions in Southern Chattogram region (i.e., Anwara, Cox's Bazar, Teknaf) of Chattogram division, and Kaliakoir region (Bangabandhu Hi-Tech City (BHTC)) in Gazipur district of Dhaka division. The Government of Bangladesh (GoB) has undertaken this project to develop grid interfacing infrastructure to ensure efficient and uninterrupted power transmission in the project areas. Project activities include: Construction of four substations with a total capacity of approximately 1,820 megavolt-amperes (MVA) at BHTC, Anwara, Cox's Bazar (North), Teknaf, and two bay extensions at the existing Kaliakoir Substation; and Construction of approximately 180.43 km transmission line (in four segments): BHTC to Kaliakoir; Anwara to Cox's Bazar (North); Cox's Bazar (North) to Teknaf; and Line-In-Line-Out (LILO) at Cox's Bazar (North) substation from an existing line.

Original sector

Energy

Budget

Location

Country

Bangladesh

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Consumer Products, Biomass, Raw Materials, Residential, Road, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Power Transmission, Automotive

Article published date

2024-10-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project