logo
ProjectRepaying

Banie Phase 3 and Sepopol Wind Farm

Sector: Wind • Location: Poland

Source: European Bank for Reconstruction and Development (EBRD)

A loan for the construction, commissioning and operation of 81.4 MWe wind power project located in north-western Poland (the "Project").  This is an extention of a Bank funded Project (DTM 47932), approved Phase 1 and 2 of the same Project. The Project has been categorized A category due to cumulative impacts. The Project has been developed by by Energix Polska Sp.z.o.o, (the “Developer”).  The Pr

Status
Under Construction
Sector
Wind, Raw Materials, Power Generation (CCGT), Residential, Commercial, Government
Location
Poland
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Banie Phase 3 and Sepopol Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Banie Phase 3 and Sepopol Wind Farm” is an infrastructure initiative in the Wind sector, located in Poland. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A loan for the construction, commissioning and operation of 81.4 MWe wind power project located in north-western Poland (the "Project").  This is an extention of a Bank funded Project (DTM 47932), approved Phase 1 and 2 of the same Project. The Project has been categorized A category due to cumulative impacts. The Project has been developed by by Energix Polska Sp.z.o.o, (the “Developer”).  The Project will contribute to climate mitigation by increasing the share of renewable energy generation in Poland and add 81.4 MW wind generation capacity to the national energy system. In addition, the Project will strengthen the private sector's role in the renewable energy sector in Poland. ESIA disclosure for Phase 1 and Phase 2 of the Project 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA Supplemental Study 5. Environmental Impact Assessment 6. Environmental Permit Download entire package in in Zip format NTS: English | Polish SEP: English | Polish ESAP: English | Polish The documents are also available on the Energix web site The Company is developing another wind farm (Zelchowo) in the near vicinity and has disclosed the local EIA and NTS for this project. NTS for Zelchowo Wind farm: Polish | English Full EIA for Zelechow Full ESIA documentation is available locally at: Energix Polska Sp. Z o.o. Plac Stanisława Małachowskiego 2 00-066 Warszawa Contact: Magdalena Sankowska, Office Manager, email: magdalenas@energix-group.com, tel. +48 514 482 156 And Banie commune Urząd Gminy Banie, ul. Skośna 6, 74-110 Banie, (tel.) +48 91 41 66 381, urzad@banie.pl Major Arkadiusz Augustyniak  (tel.) +48 91 41 66 381, wojt@banie.pl And Widuchowa commune Urząd Gminy Widuchowa, Grunwaldzka 8, 74-120 Widuchowa, (tel.) +48 91 41 67 255, org@widuchowa.pl Major Paweł Wróbel, (tel.) +48 606 363 632 Environmental or social enquiries Magdalena Sankowska,  email: magdalenas@energix-group.com, tel. +48 514 482 156; Energix Polska Sp. z o.o. Plac Stanisława Małachowskiego 2; 00-066 Warsaw

Original sector

Energy

Budget

Location

Country

Poland

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Residential, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project