Banie Phase 3 and Sepopol Wind Farm
Sector: Wind • Location: Poland
Source: European Bank for Reconstruction and Development (EBRD)
A loan for the construction, commissioning and operation of 81.4 MWe wind power project located in north-western Poland (the "Project"). This is an extention of a Bank funded Project (DTM 47932), approved Phase 1 and 2 of the same Project. The Project has been categorized A category due to cumulative impacts. The Project has been developed by by Energix Polska Sp.z.o.o, (the “Developer”). The Pr
- Status
- Under Construction
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Residential, Commercial, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Banie Phase 3 and Sepopol Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A loan for the construction, commissioning and operation of 81.4 MWe wind power project located in north-western Poland (the "Project"). This is an extention of a Bank funded Project (DTM 47932), approved Phase 1 and 2 of the same Project. The Project has been categorized A category due to cumulative impacts. The Project has been developed by by Energix Polska Sp.z.o.o, (the “Developer”). The Project will contribute to climate mitigation by increasing the share of renewable energy generation in Poland and add 81.4 MW wind generation capacity to the national energy system. In addition, the Project will strengthen the private sector's role in the renewable energy sector in Poland. ESIA disclosure for Phase 1 and Phase 2 of the Project 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA Supplemental Study 5. Environmental Impact Assessment 6. Environmental Permit Download entire package in in Zip format NTS: English | Polish SEP: English | Polish ESAP: English | Polish The documents are also available on the Energix web site The Company is developing another wind farm (Zelchowo) in the near vicinity and has disclosed the local EIA and NTS for this project. NTS for Zelchowo Wind farm: Polish | English Full EIA for Zelechow Full ESIA documentation is available locally at: Energix Polska Sp. Z o.o. Plac Stanisława Małachowskiego 2 00-066 Warszawa Contact: Magdalena Sankowska, Office Manager, email: magdalenas@energix-group.com, tel. +48 514 482 156 And Banie commune Urząd Gminy Banie, ul. Skośna 6, 74-110 Banie, (tel.) +48 91 41 66 381, urzad@banie.pl Major Arkadiusz Augustyniak (tel.) +48 91 41 66 381, wojt@banie.pl And Widuchowa commune Urząd Gminy Widuchowa, Grunwaldzka 8, 74-120 Widuchowa, (tel.) +48 91 41 67 255, org@widuchowa.pl Major Paweł Wróbel, (tel.) +48 606 363 632 Environmental or social enquiries Magdalena Sankowska, email: magdalenas@energix-group.com, tel. +48 514 482 156; Energix Polska Sp. z o.o. Plac Stanisława Małachowskiego 2; 00-066 Warsaw |
Original sector | Energy |
Budget |
Location
Country | Poland |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Residential, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
