Bank of America - Boulder, CO
Sector: Power Generation (CCGT) • Location: Boulder, Colorado, United States of America
Source: Dodge
Work To Include Select Demolition @ Construction Of New Partitions, Ceiling, Finishes, Mechanical, Electrical, Plumbing & Fire Protection As Indicated On Drawings.the Drawings Comprise The Contract Documents Outlining The Design Intent And Project Scope, And May Be Supplemented By Further Information Issued By Architect.drawings Are Arranged In General To Specific Order, Following A Top To Bottom,
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial
- Location
- Boulder, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bank of America - Boulder, CO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work To Include Select Demolition @ Construction Of New Partitions, Ceiling, Finishes, Mechanical, Electrical, Plumbing & Fire Protection As Indicated On Drawings.the Drawings Comprise The Contract Documents Outlining The Design Intent And Project Scope, And May Be Supplemented By Further Information Issued By Architect.drawings Are Arranged In General To Specific Order, Following A Top To Bottom, Right To Left Format. Contractors Are Advised To Read And Familiarize Themselves With The Inform... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Boulder |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
