Bankhead Wallace Tunnel Maintenance & Clean
One of 10,000+ projects Taiyo tracks in Alabama.
Source: Dodge USA
This Section shall cover the services, equipment, and materials necessary to provide for the cleaning, repair and replacement of lamps and ballasts for all lighting fixtures, traffic signals, lane control signals and emergency exit signs, within the tunnel tubes and ramps from grade point to grade point in the George C. Wallace and Bankhead Tunnels. This contract does not include maintenance on th
- Status
- Closed
- Sector
- Road, Tunnel, Commercial
- Location
- Mobile, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bankhead Wallace Tunnel Maintenance & Clean
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Section shall cover the services, equipment, and materials necessary to provide for the cleaning, repair and replacement of lamps and ballasts for all lighting fixtures, traffic signals, lane control signals and emergency exit signs, within the tunnel tubes and ramps from grade point to grade point in the George C. Wallace and Bankhead Tunnels. This contract does not include maintenance on the 'Variable Message Sign" at Bankhead Tunnel. The Contractor shall furnish the equipment, service... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Mobile |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Tunnel, Commercial |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
