Banshkhali embankment rehabilitation project
Sector: Water Supply and Storage • Location: Banshkhali, Bangladesh
Source: The Climate Watch
The project involved rehabilitating damaged infrastructure under Polders No. 64/1A, 64/1B and 64/1C in Banshkhali upazila, Bangladesh, to protect communities from cyclones and storm surges. It included protecting 10 km of embankment slopes with concrete blocks, reconstructing 2 km of embankment, and 3.5 km of protective work along the Sangu River, aiming to protect about 15,901 hectares of land. T
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement
- Location
- Banshkhali, Bangladesh
- Updated
- 22 Jul 2026
- Source
- The Climate Watch
ConstructChat
Ask ConstructChat about Banshkhali embankment rehabilitation project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed and collapsed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involved rehabilitating damaged infrastructure under Polders No. 64/1A, 64/1B and 64/1C in Banshkhali upazila, Bangladesh, to protect communities from cyclones and storm surges. It included protecting 10 km of embankment slopes with concrete blocks, reconstructing 2 km of embankment, and 3.5 km of protective work along the Sangu River, aiming to protect about 15,901 hectares of land. The project was completed in June 2022 but collapsed within four years due to construction quality, maintenance failures, and climate-related coastal pressures. |
Original sector | Water Management |
Budget |
Location
Country | Bangladesh |
City | Banshkhali |
Source
Source | The Climate Watch |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bangladesh
- Bibiyana South CombinedCycle Power Plant
- Maitree Super Thermal Power Project Bangladesh
- Payra Sea Port Dredging Concession
- Chittagong Container Terminal (second contract)
- SAIDABAD RAW WATER CONVEYOR
- Sirajganj 225 MW Combined Cycle Power Plant (2nd Unit-Dual Fuel)
- Moheshkhali Floating LNG Terminal
- Gandharbpur Drinking Water Treatment Plant
