Baobab FPSO Dry Dock Refurbishment Project
Sector: Oil and Gas • Location: Côte d'Ivoire
Source: World Oil
The Baobab FPSO Dry Dock Refurbishment Project involves the refurbishment of the FPSO Baobab Ivoirien MV10, operated by CNRI, following the cessation of hydrocarbon production. The vessel is scheduled to be towed to shipyards in Dubai for refurbishment, with production expected to continue until at least 2038 after the completion of the project.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- World Oil
ConstructChat
Ask ConstructChat about Baobab FPSO Dry Dock Refurbishment Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Baobab FPSO Dry Dock Refurbishment Project involves the refurbishment of the FPSO Baobab Ivoirien MV10, operated by CNRI, following the cessation of hydrocarbon production. The vessel is scheduled to be towed to shipyards in Dubai for refurbishment, with production expected to continue until at least 2038 after the completion of the project. |
Original sector | Energy |
Location
Country | Cote d'Ivoire |
Source
Source | World Oil |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
