Baobab FPSO Refurbishment
Sector: Oil and Gas • Location: Ivory Coast
Source: Upstream Online
Canadian Natural Resources has stopped production from its Baobab oilfield offshore Ivory Coast as it prepares to mobilise the asset’s floating production, storage and offloading vessel to the Middle East for refurbishment work. The Baobab FPSO ceased hydrocarbon production as scheduled on 31 January, with the final lifting of crude set to take place on or around 6 February.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- Upstream Online
ConstructChat
Ask ConstructChat about Baobab FPSO Refurbishment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Canadian Natural Resources has stopped production from its Baobab oilfield offshore Ivory Coast as it prepares to mobilise the asset’s floating production, storage and offloading vessel to the Middle East for refurbishment work. The Baobab FPSO ceased hydrocarbon production as scheduled on 31 January, with the final lifting of crude set to take place on or around 6 February. |
Original sector | Energy |
Location
Country | Cote d'Ivoire |
Source
Source | Upstream Online |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
