Baotou Iron & Steel Energy Efficiency Project

Sector: Power Generation (CCGT) • Location: China

Source: World Bank

Project
Closed

The development objective of the Baotou Iron and Steel Energy Efficiency Project for China is to mitigate global environmental impacts of carbon dioxide (C02) emissions through purchase of C02 emissions avoided by the operation of the Baotou Iron and Steel Group Co., Ltd (BISCO) Coke dry quenching (CDQ) project under the clean development mechanism (CDM). The project was approved as a CDM project

Project Information FAQ

Project Information

5 Q
The project “Baotou Iron & Steel Energy Efficiency Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Baotou Iron and Steel Energy Efficiency Project for China is to mitigate global environmental impacts of carbon dioxide (C02) emissions through purchase of C02 emissions avoided by the operation of the Baotou Iron and Steel Group Co., Ltd (BISCO) Coke dry quenching (CDQ) project under the clean development mechanism (CDM). The project was approved as a CDM project by National Development and Reform Commission (NDRC) in 2007. It consists of three sets of CDQ heat recovery boilers (No. 1, 2, 3) and steam turbine generators at the back of six coke ovens (No. 5 to 10) to utilize the heat from red-hot coke for power generation. The total installed capacity of the three sets of power generators operating on recovered waste heat is 45 Megawatt (MW) (3x1 5MW) with an expected net electricity generation of around 250 gigawatt hour (GWh) per year. The investment cost of the CDQ project was US$67.5m. Electricity generated by these generators will replace the same amount of elasticity that BISCO otherwise will have to purchase from the coal-fired power plants of the power grid, thus resulting in reduced greenhouse gas (GHG) emissions. The project is to support China s participation in global efforts to address climate change through CDM projects, and to contribute to China s sustainable development. The project contributes to these objectives by improving energy, efficiency in the iron and steel industry and significant reductions in emissions of environment pollutants.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data