Baraka Patenga Power Limited

Sector: Power Generation (CCGT) • Location: Bangladesh

Source: World Bank Group

Project
Active

On 31st July 2011, state owned BPDB signed an implementation agreement with Baraka Patenga Power Limited (BPPL), a SPV set up by Barakatullah Electro Dynamics Limited (51% share), to set up a 50 MW HFO based power plant at Patenga in Chittagong. The plant was being set up on a build-own-operate basis.The plant would use total 8 units of Rolls-Royce B32:40V16 liquid fuel engines having a generation

Status
Prospective
Sector
Power Generation (CCGT), Government, Commercial
Location
Bangladesh
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Baraka Patenga Power Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Baraka Patenga Power Limited” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 31st July 2011, state owned BPDB signed an implementation agreement with Baraka Patenga Power Limited (BPPL), a SPV set up by Barakatullah Electro Dynamics Limited (51% share), to set up a 50 MW HFO based power plant at Patenga in Chittagong. The plant was being set up on a build-own-operate basis.The plant would use total 8 units of Rolls-Royce B32:40V16 liquid fuel engines having a generation capacity of 6.984 MW per unit along with other balance of plants. The BPPL plant would generate and sell electricity to BPDB for a term of 15 years under a PPA signed between BPDB and BPPL on July 31, 2011.The Project was awarded through a competitive bidding process by BPDB to supply power for 15 years as Independent Power Plant (IPP). The project reached financial closure on 20th March 2013. The estimated project cost at the time of financial closure was US$ 40.3mn (BDT 3150mn @78.1 BDT/USD). Financing comprised term loans of US$ 27.5mn (BDT 2150mn) and sponsor equity of US$ 12.8mn (BDT 1000mn). The debt equity ratio was 68/32. Investment Promotion and Financing Facility (IPFF) Project disbursed around US$20 million from its on-lending component. The loan was for a tenure of 12 years and was priced at 330 basis points over LIBOR. This was the first US Dollar Financing from IPFF. IPFF is a project financed by the World Bank and the government of Bangladesh and implemented by Bangladesh Bank on behalf of Finance Division under the Ministry of Finance. The company started its commercial operation from 4th May 2014 having dependable capacity of 50.815 MW.

Original sector

Energy

Budget

Location

Country

Bangladesh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project