Barakah Nuclear Energy Plant
Sector: Nuclear • Location: Abu Dhabi, UAE
Source: Arabian Business
The Barakah Nuclear Energy Plant in the UAE has completed its first year of full operations with four reactors. The plant provides 25% of the UAE's electricity needs and significantly contributes to the country's clean energy transition. Construction began in July 2012, with Unit 4 completed in December 2023 and operations starting in September 2024. The plant has generated over 120 TWh of electri
- Status
- Closed
- Sector
- Nuclear, Power Generation (CCGT)
- Location
- Abu Dhabi, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- Arabian Business
ConstructChat
Ask ConstructChat about Barakah Nuclear Energy Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Barakah Nuclear Energy Plant in the UAE has completed its first year of full operations with four reactors. The plant provides 25% of the UAE's electricity needs and significantly contributes to the country's clean energy transition. Construction began in July 2012, with Unit 4 completed in December 2023 and operations starting in September 2024. The plant has generated over 120 TWh of electricity since Unit 1 began operations in December 2018. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
State | Abu Dhabi |
Source
Source | Arabian Business |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
