Barakah Nuclear Power Plant
Sector: Power Generation (CCGT) • Location: United Arab Emirates
Source: The Global Energy Association
The fourth power unit of the Barakah Nuclear Power Plant in the UAE was connected to the grid and put into operation in 2024. This plant is significant as it is the first nuclear power plant in the UAE and the Middle East, expected to provide a quarter of the country's electricity needs from 2025.
- Status
- Closed
- Sector
- Power Generation (CCGT), Nuclear
- Location
- United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- The Global Energy Association
ConstructChat
Ask ConstructChat about Barakah Nuclear Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The fourth power unit of the Barakah Nuclear Power Plant in the UAE was connected to the grid and put into operation in 2024. This plant is significant as it is the first nuclear power plant in the UAE and the Middle East, expected to provide a quarter of the country's electricity needs from 2025. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
Source
Source | The Global Energy Association |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Nuclear |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
