Barapullah III Bridge Project
Sector: Bridge • Location: Delhi, India
Source: The Times of India
The Barapullah III bridge project in Delhi has been stalled for 10 years due to an 8.5-acre land dispute. Construction began before acquiring all required land, leading to objections from residents and halting work on a crucial stretch. The land dispute lasted from 2016 to 2023, with disagreements over compensation rates. Environmental and regulatory clearances, engineering challenges, and the Cov
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | delayed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Barapullah III bridge project in Delhi has been stalled for 10 years due to an 8.5-acre land dispute. Construction began before acquiring all required land, leading to objections from residents and halting work on a crucial stretch. The land dispute lasted from 2016 to 2023, with disagreements over compensation rates. Environmental and regulatory clearances, engineering challenges, and the Covid-19 pandemic further delayed progress. The project was partially opened in pieces in 2021, but remains unfinished with significant cost overruns and hidden losses. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in India
- Supreme Panvel Indapur Tollways Private Limited
- Howrah Bridge
- Chenani-Nashri Tunnel (Patnitop Tunnel), India
- Chennai Outer Ring Road (ORR), Tamil Nadu, India
- Nagpur City Ring Road Package I
- Kochi LNG Terminal
- Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0) funding (Package I)
- Four laning of Barhi to Hazaribagh section of NH 33 in Jharkhand
