Barbours Cut Terminal Container Yard 7 North Construction
Sector: Seaport • Location: La Porte, Texas, United States of America
Source: Dodge
Construct Container Yard 7 North at Barbours Cut, approximately 11.6 acres to be used as an empty container yard. Scope includes demolition, earthwork, drainage, RCC and JRCP pavements, drainage system, electrical and other utility work, striping, and fencing.
- Status
- Closed
- Sector
- Seaport, Road, Power Transmission, Power Generation (CCGT), Commercial, Government, Waste Processing and Treatment
- Location
- La Porte, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Barbours Cut Terminal Container Yard 7 North Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct Container Yard 7 North at Barbours Cut, approximately 11.6 acres to be used as an empty container yard. Scope includes demolition, earthwork, drainage, RCC and JRCP pavements, drainage system, electrical and other utility work, striping, and fencing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | La Porte |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Seaport, Road, Power Transmission, Power Generation (CCGT), Commercial, Government, Waste Processing and Treatment |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in United States of America
- Port Gamble S’Klallam Broadband Complete Connectivity Project
- Construction of a multi-family building with 210 apartments in La Marina (Barcelona)
- Boston viaduct bridge repairs (United States)
- New 2,485 m long single-track railway access for the Port of Seville for freight traffic (Seville)
- Improvement works at the WWTP (Water Waste Treatment Plant) in Madrid (Spain)
- installation of a combination of flood walls and deployable flip-up barriers to protect the neighborhood and reduce flooding risk from Brooklyn bridge to Montgomery Street in NYC (United States)
- Development of the tunneling works for the Western Harbour Tunnel - Southern Tunneling Works of the Rozelle Interchange contract in Sydney (Australia)
- Indoor Vehicle Exhaust System
