logo
ProjectActive

Bareilly Highways Project Limited

Sector: Road • Location: India

Source: World Bank Group

In April 2010, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of Era Infra Engineering Limited (India) and OJSC-SIBMOST (Russia) for the strengthening,improvement, four-laning, operation and maintenance, and tolling of 151.2kms of Bareilly-Sitapur section of National Highway-24 (NH-24) from Km262 to Km413.2,i

Status
Prospective
Sector
Road, Bridge, Government, Waste Processing and Treatment, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bareilly Highways Project Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bareilly Highways Project Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In April 2010, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of Era Infra Engineering Limited (India) and OJSC-SIBMOST (Russia) for the strengthening,improvement, four-laning, operation and maintenance, and tolling of 151.2kms of Bareilly-Sitapur section of National Highway-24 (NH-24) from Km262 to Km413.2,in the state of Uttar Pradesh. Under the contract, the consortium was responsible for the design, construction,finance, operation and maintenance and widening of the existing two-lane highway to a four-lane highway with paved shoulders. The scope will include construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections,interchanges, drains, etc.The expansion project, part of National Highway Development Project Phase - III, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. The consortium of Era Infra Engineering Limited (74%) and OJSC-SIBMOST (26%), established Bareilly Highways Project Limited, a special purpose vehicle, to implement the project. The consortium won the tender through competitive bidding,conducted by NHAI, by requesting the lowest fixed subsidy of US$ 56.7 million (INR 2550 million @ 45 INR/USD).Under the contract, Bareilly Highways Project Limited was to recover the capital costs and operating costs including returns through tolling during the term of concession. The concession agreement was signed in May 2010. The project attained financial closure in December 2010. The debt equity ratio of the project was 72:28. The estimated capital cost of the project at the time of financial closure was US$ 433.5 (INR 19510 mn @ 45 INR/USD) million. Financing comprised INR 14000mn 15year term loan and INR 5510mn equity. The INR 14000mn term loan consisted of INR13500 term loan A and INR 500mn term loan B.The debt was arranged by SBI Capital Markets Ltd. Construction on the project began in December 2010 and was expected to be completed by June 2013.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Bridge, Government, Waste Processing and Treatment, Automotive, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project