Barekese Double Circuit Sub-Transmission Tower Line Reconstruction and Upgrade
Sector: Water Supply and Storage • Location: Barekese, Ashanti Region, Ghana
Source: CediRates
Reconstruction of the Barekese double circuit sub-transmission tower line and upgrade from 150mm² to 400mm² conductors to enhance voltage quality and reliability for the Ghana Water Dam site, Offinso, and surrounding communities. Replacement of aging transmission towers to improve network resilience.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro
- Location
- Barekese, Ashanti Region, Ghana
- Updated
- 22 Jul 2026
- Source
- CediRates
ConstructChat
Ask ConstructChat about Barekese Double Circuit Sub-Transmission Tower Line Reconstruction and Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruction of the Barekese double circuit sub-transmission tower line and upgrade from 150mm² to 400mm² conductors to enhance voltage quality and reliability for the Ghana Water Dam site, Offinso, and surrounding communities. Replacement of aging transmission towers to improve network resilience. |
Original sector | Energy |
Location
Country | Ghana |
State | Ashanti Region |
City | Barekese |
Source
Source | CediRates |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ghana
- Establishment of Commercial Poultry Farm
- Ghalia Ghana Company Limited
- Zoompak Teshie Transfer Station and Medical Waste Treatment Facility
- Ghana - Improved Sanitation and Water Supply Service Delivery to the Urban Poor in Ghana through Tripartite Partnerships
- KPONG DAM RETROFIT
- Establishment of an ultra-modern vegetable processing centre
- Establishment of a Shea Processing factory
- Befesa Desalination Plant
