Barker Field Renovation-Phase 1
Sector: Manufacturing (Industrial) • Location: Hilton Head Island, South Carolina, United States of America
Source: Dodge USA
Barker Field located at 70 Baygall Road, Hilton Head Island, SC 29926. The selected Contractor shall construct Phase 1 of the project, which includes the regrading and reseeding of the existing soccer field, new field lights, a new restroom building (not in contract), removing and replacing portions of an existing pathway, improvements to the existing field drainage system, landscaping and lightin
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Road, Government, Commercial, Waste Processing and Treatment
- Location
- Hilton Head Island, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Barker Field Renovation-Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Barker Field located at 70 Baygall Road, Hilton Head Island, SC 29926. The selected Contractor shall construct Phase 1 of the project, which includes the regrading and reseeding of the existing soccer field, new field lights, a new restroom building (not in contract), removing and replacing portions of an existing pathway, improvements to the existing field drainage system, landscaping and lighting. The Town of Hilton Head Island may be seeking a consultant to provide design services for Bark... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Hilton Head Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
