This project has followed a phased-approach: Phase 1: Beginning in 2009 completed in 2014. The key component’s with this work was the upgrading of the existing secondary clarifier and additional of a second aeration basin. Phase 2: This project included the upgrading of the existing UV disinfection systems & Head-works Screening Faculty. The UV Disinfection System has been completed and is operati

Status
Under Construction
Sector
Water Supply and Storage, Waste Processing and Treatment, Road, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Barker Street Waste Water Treatment Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Barker Street Waste Water Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project has followed a phased-approach: Phase 1: Beginning in 2009 completed in 2014. The key component’s with this work was the upgrading of the existing secondary clarifier and additional of a second aeration basin. Phase 2: This project included the upgrading of the existing UV disinfection systems & Head-works Screening Faculty. The UV Disinfection System has been completed and is operating as designed, and construction of the Head-works Facility is expected to begin late June 2019. Phase 3: This project is the construction/addition of another secondary clarifier. This project is close to completion. This application covers Phase 4: From the original 2007 design the key Phase 4 components are Solids Handling , Odor Control and Site/Civil works. In particular this is the replacement of 1970’s vintage sludge pumping systems, gravity thickening equipment, sludge blend tanks, internal/external piping, sludge dewatering, electrical & control systems - Supervisory Controls and Data Acquisition (SCADA). This phase of the work will directly improve environmental performance by improving wastewater treatment, reducing pipe failures and water loss and ensuring that any impacts on adjacent water bodies is mitigated. In addition, the design of infrastructure renewal projects does factor in the impacts of climate change and thus also serve as adaptation projects.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project