Barker Street Waste Water Treatment Plant
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
This project has followed a phased-approach: Phase 1: Beginning in 2009 completed in 2014. The key component’s with this work was the upgrading of the existing secondary clarifier and additional of a second aeration basin. Phase 2: This project included the upgrading of the existing UV disinfection systems & Head-works Screening Faculty. The UV Disinfection System has been completed and is operati
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Barker Street Waste Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project has followed a phased-approach: Phase 1: Beginning in 2009 completed in 2014. The key component’s with this work was the upgrading of the existing secondary clarifier and additional of a second aeration basin. Phase 2: This project included the upgrading of the existing UV disinfection systems & Head-works Screening Faculty. The UV Disinfection System has been completed and is operating as designed, and construction of the Head-works Facility is expected to begin late June 2019. Phase 3: This project is the construction/addition of another secondary clarifier. This project is close to completion. This application covers Phase 4: From the original 2007 design the key Phase 4 components are Solids Handling , Odor Control and Site/Civil works. In particular this is the replacement of 1970’s vintage sludge pumping systems, gravity thickening equipment, sludge blend tanks, internal/external piping, sludge dewatering, electrical & control systems - Supervisory Controls and Data Acquisition (SCADA). This phase of the work will directly improve environmental performance by improving wastewater treatment, reducing pipe failures and water loss and ensuring that any impacts on adjacent water bodies is mitigated. In addition, the design of infrastructure renewal projects does factor in the impacts of climate change and thus also serve as adaptation projects. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project