logo

Barn at Windover / Material Design Build

Sector: Forest Products and Packaging • Location: United States

Source: ArchDaily

Project
Closed

The first phase was the selective removal of 20 years of trees and shrubs that had overgrown the building, careful grading to ensure drainage and a complete restoration of the original stone foundation. Next came structural repairs to the timber frame using the same timber species and joinery to minimize the visibility of these interventions. Then we reinstalled the original siding, filling in gap

Project Information FAQ

Project Information

5 Q
The project “Barn at Windover / Material Design Build” is an infrastructure initiative in the Forest Products and Packaging sector, located in United States. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The first phase was the selective removal of 20 years of trees and shrubs that had overgrown the building, careful grading to ensure drainage and a complete restoration of the original stone foundation. Next came structural repairs to the timber frame using the same timber species and joinery to minimize the visibility of these interventions. Then we reinstalled the original siding, filling in gaps with similar reclaimed boards wherever the originals were too deteriorated for re-use.Lastly, we built new windows and doors to match their original style and location. We estimate that this is the fourth time the building has been rehabbed in its 150+ year life. This most recent intervention will put it well into its next century of life and beyond.In the third phase, we wrapped the entire structure in a layer of plywood — a layer that is invisible from inside and out but adds crucial stiffness and shear resistance to the frame where the original mortise and tenon joinery had failed due to rot. Over this, we installed a new layer of siding in "rain screen" fashion: first a waterproof breathable membrane, then vertical wooden battens to create a drainage plane and air cavity. Over this, we installed the new, locally milled hemlock siding so it can dry and breathe. This system gives the siding and the building the longest possible lifespan with a classic reverse board-and-batten appearance.Text description provided by the architects.MDB was selected by a wonderful couple to preserve their circa 1860 timber-frame barn. The barn hadn't been touched in over 60 years but for the turkey vultures who had made it their home. Despite its rough condition, the barn is an integral part of the farmstead and demolishing and/or replacing it was quickly ruled out. We created a plan that would preserve its weathered character while stabilizing the structure and protecting it for the long term.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data