Barn at Windover / Material Design Build
Sector: Forest Products and Packaging • Location: United States
Source: ArchDaily
The first phase was the selective removal of 20 years of trees and shrubs that had overgrown the building, careful grading to ensure drainage and a complete restoration of the original stone foundation. Next came structural repairs to the timber frame using the same timber species and joinery to minimize the visibility of these interventions. Then we reinstalled the original siding, filling in gap
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The first phase was the selective removal of 20 years of trees and shrubs that had overgrown the building, careful grading to ensure drainage and a complete restoration of the original stone foundation. Next came structural repairs to the timber frame using the same timber species and joinery to minimize the visibility of these interventions. Then we reinstalled the original siding, filling in gaps with similar reclaimed boards wherever the originals were too deteriorated for re-use.Lastly, we built new windows and doors to match their original style and location. We estimate that this is the fourth time the building has been rehabbed in its 150+ year life. This most recent intervention will put it well into its next century of life and beyond.In the third phase, we wrapped the entire structure in a layer of plywood — a layer that is invisible from inside and out but adds crucial stiffness and shear resistance to the frame where the original mortise and tenon joinery had failed due to rot. Over this, we installed a new layer of siding in "rain screen" fashion: first a waterproof breathable membrane, then vertical wooden battens to create a drainage plane and air cavity. Over this, we installed the new, locally milled hemlock siding so it can dry and breathe. This system gives the siding and the building the longest possible lifespan with a classic reverse board-and-batten appearance.Text description provided by the architects.MDB was selected by a wonderful couple to preserve their circa 1860 timber-frame barn. The barn hadn't been touched in over 60 years but for the turkey vultures who had made it their home. Despite its rough condition, the barn is an integral part of the farmstead and demolishing and/or replacing it was quickly ruled out. We created a plan that would preserve its weathered character while stabilizing the structure and protecting it for the long term. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
