logo
ProjectClosed

Barn at Windover / Material Design Build

One of 10,000+ projects Taiyo tracks in United States.

Source: ArchDaily

The first phase was the selective removal of 20 years of trees and shrubs that had overgrown the building, careful grading to ensure drainage and a complete restoration of the original stone foundation. Next came structural repairs to the timber frame using the same timber species and joinery to minimize the visibility of these interventions. Then we reinstalled the original siding, filling in gap

Status
Closed
Sector
Forest Products and Packaging, Residential, Waste Processing and Treatment, Commercial
Location
United States of America
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Barn at Windover / Material Design Build

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Barn at Windover / Material Design Build” is an infrastructure initiative in the Forest Products and Packaging sector, located in United States. Taiyo aggregates data on it from ArchDaily.

Participants

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The first phase was the selective removal of 20 years of trees and shrubs that had overgrown the building, careful grading to ensure drainage and a complete restoration of the original stone foundation. Next came structural repairs to the timber frame using the same timber species and joinery to minimize the visibility of these interventions. Then we reinstalled the original siding, filling in gaps with similar reclaimed boards wherever the originals were too deteriorated for re-use.Lastly, we built new windows and doors to match their original style and location. We estimate that this is the fourth time the building has been rehabbed in its 150+ year life. This most recent intervention will put it well into its next century of life and beyond.In the third phase, we wrapped the entire structure in a layer of plywood — a layer that is invisible from inside and out but adds crucial stiffness and shear resistance to the frame where the original mortise and tenon joinery had failed due to rot. Over this, we installed a new layer of siding in "rain screen" fashion: first a waterproof breathable membrane, then vertical wooden battens to create a drainage plane and air cavity. Over this, we installed the new, locally milled hemlock siding so it can dry and breathe. This system gives the siding and the building the longest possible lifespan with a classic reverse board-and-batten appearance.Text description provided by the architects.MDB was selected by a wonderful couple to preserve their circa 1860 timber-frame barn. The barn hadn't been touched in over 60 years but for the turkey vultures who had made it their home. Despite its rough condition, the barn is an integral part of the farmstead and demolishing and/or replacing it was quickly ruled out. We created a plan that would preserve its weathered character while stabilizing the structure and protecting it for the long term.

Procurement method

Location

Country

United States of America (USA)

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Residential, Waste Processing and Treatment, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project