Barnegat Ave Water Main Replacement - Phase I
Sector: Water Supply and Storage • Location: Seaside Heights, New Jersey, United States of America
Source: Dodge
The work will include but is not limited to the installation of approximately 1,200 linear feet of eight-inch (8") DIP potable water mains on Barnegat Ave (between Sampson Ave and Carteret Ave) and Carteret Ave. (between Barnegat Ave. and Central Ave.) This process will also consist of service connections, valves, fire hydrants, site restoration, paving, hydrostatic testing, disinfection & dichlor
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Government, Commercial, Rail, Road
- Location
- Seaside Heights, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Barnegat Ave Water Main Replacement - Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work will include but is not limited to the installation of approximately 1,200 linear feet of eight-inch (8") DIP potable water mains on Barnegat Ave (between Sampson Ave and Carteret Ave) and Carteret Ave. (between Barnegat Ave. and Central Ave.) This process will also consist of service connections, valves, fire hydrants, site restoration, paving, hydrostatic testing, disinfection & dichlorination, traffic control and all related appurtenances. The contractor is responsible for providi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Seaside Heights |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Government, Commercial, Rail, Road |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
