logo

Barnhill Memorial School - Ventilation Upgrades

Sector: Education • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

This project consist of the installation of a central ventilation system at Barnhill Memorial School. Originally constructed in 1951, the school is three stories and includes 26 classrooms and ancillary spaces which are naturally ventilated through exterior windows. The proposed project includes the installation of a central built up air handling unit in a new mechanical room built on an existing

Project Information FAQ

Project Information

5 Q
The project “Barnhill Memorial School - Ventilation Upgrades” is an infrastructure initiative in the Education sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consist of the installation of a central ventilation system at Barnhill Memorial School. Originally constructed in 1951, the school is three stories and includes 26 classrooms and ancillary spaces which are naturally ventilated through exterior windows. The proposed project includes the installation of a central built up air handling unit in a new mechanical room built on an existing balcony in the gymnasium. New distribution ductwork will be routed to student learning spaces. Outdoor air will be preconditioned through an energy recovery unit. A new high efficiency natural gas fired boiler will provide heating hot water to the air handling unit as required. Total air volume delivered to the classrooms will encourage removal of airborne contaminants. The building automation system will be upgraded and expanded to incorporate the new air handling units and provide centralized control and scheduling, improving energy efficiency.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data