Barnhill Memorial School - Ventilation Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
This project consist of the installation of a central ventilation system at Barnhill Memorial School. Originally constructed in 1951, the school is three stories and includes 26 classrooms and ancillary spaces which are naturally ventilated through exterior windows. The proposed project includes the installation of a central built up air handling unit in a new mechanical room built on an existing
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Natural Gas, Commercial, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Barnhill Memorial School - Ventilation Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consist of the installation of a central ventilation system at Barnhill Memorial School. Originally constructed in 1951, the school is three stories and includes 26 classrooms and ancillary spaces which are naturally ventilated through exterior windows. The proposed project includes the installation of a central built up air handling unit in a new mechanical room built on an existing balcony in the gymnasium. New distribution ductwork will be routed to student learning spaces. Outdoor air will be preconditioned through an energy recovery unit. A new high efficiency natural gas fired boiler will provide heating hot water to the air handling unit as required. Total air volume delivered to the classrooms will encourage removal of airborne contaminants. The building automation system will be upgraded and expanded to incorporate the new air handling units and provide centralized control and scheduling, improving energy efficiency. |
Original sector | Ventilation Systems |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Natural Gas, Commercial, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
