In November 2000, CAT LEO Energia S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 35-year contract to build and operate a 39 MW hydro power plant located in the Pomba River, state of Minas Gerais. Information on the other bidders was not available.

The bidding criteria set by ANEEL was the highest price paid for the concession rights. CAT LEO prese

Project Information FAQ

Project Information

5 Q
The project “Barra do Brauna Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2000, CAT LEO Energia S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 35-year contract to build and operate a 39 MW hydro power plant located in the Pomba River, state of Minas Gerais. Information on the other bidders was not available. The bidding criteria set by ANEEL was the highest price paid for the concession rights. CAT LEO presented the highest offer, a value of US$ 3.4 million (BRL 6.9 million, in 2009 value). The contract was signed in March 2001, and Cat-Leo Construcoes Industria e Servicos S/A (Cat-Leo Cise) became responsible to lead the project during the 35-year contract period. In the end of 2007, the project was acquired by Brascan Energetica S.A., a wholly-owned subsidiary of the Canadian Brookfield Renewable Power Inc. The sponsor created the company Barra do Brauna Energetica S.A. to undertake the project. The sponsor committed to invest US$ 92.5 million (BRL 185 million) in the power plant. Although construction works started in June 2007, financial closure was only achieved in August 2009, when the sponsor was granted a US$ 59 million (BRL 118 million) loan from BNDES. Operations commenced in December 2009. status should be updated in 2010

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data