logo

Barra Grande Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

The consortium Barra Grande Energia SA, won a 35 years concession to build and operate the 690 MW Barra Grande hydroelectric power plant in the Pelotas River, on the border of the Brazilian states Santa Catarina and Rio Grande do Sul. The consortium was composed by CPFL Energia, Alcoa, Valesul Aluminio SA, and DME Energetica Ltda. The company offered the winning bid of US$ 118 million (R$ 232 mill

Project Information FAQ

Project Information

4 Q
The project “Barra Grande Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The consortium Barra Grande Energia SA, won a 35 years concession to build and operate the 690 MW Barra Grande hydroelectric power plant in the Pelotas River, on the border of the Brazilian states Santa Catarina and Rio Grande do Sul. The consortium was composed by CPFL Energia, Alcoa, Valesul Aluminio SA, and DME Energetica Ltda. The company offered the winning bid of US$ 118 million (R$ 232 million) in the Aneel’s (Brazilian energy regulatory agency) auction, which will be paid in annual installments until the end the concession period. The concession contract was award by Aneel to Energetica Barra Grande SA (Baesa), an specific purpose enterprise, in April of 2001. The construction of the power plant was initiated in 2002. After protests by opponents of the project, construction was halted until early 2005. Energetica Barra Grande SA (Baesa) announced that it expects to invest US$ 407.3 million (R$800 million) in the project. In March 2003, Barra Grande Energia (CPFL) was authorized by ANEEL, the Brazilian regulatory agency for the eletricity sector, to transfer 25% of Baesa's shares to other shareholders. In this transaction the Companhia Brasileira de Aluminio (a subsidiary of Votorantim) acquired through CPFL Energia 15% of the stake sold by Barra Grande Energia. The remaining 10% was distributed among other shareholders. In June 2003, the Brazilian Development Bank, BNDES, approved a US$161.1 million financing (R$460 million) to Baesa. BNDEs announced that the total investment in the project is expected to be US$433.3 (R$1,300 million). The Barra Grande Power Plant became operational in 2005. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data