logo

BARRAGE D'EL HACHEF

Sector: Manufacturing (Industrial) • Location: Morocco

Source: African Development Bank (AfDB)

Project

The El Hachef dam project is part of Morocco's development plan to meet the drinking water needs of the cities of Tangier and Asilah and the secondary centers of the region. The implementation of the dam should allow the continuous operation of the El Hachef treatment plant, which is fed only 144 days a year by a catch in the water in the wadi Haricha. The volume of water that can be produced by t

Project Information FAQ

Project Information

4 Q
The project “BARRAGE D'EL HACHEF” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The El Hachef dam project is part of Morocco's development plan to meet the drinking water needs of the cities of Tangier and Asilah and the secondary centers of the region. The implementation of the dam should allow the continuous operation of the El Hachef treatment plant, which is fed only 144 days a year by a catch in the water in the wadi Haricha. The volume of water that can be produced by the station should thus increase from 14.4 million m3 per year to 41.9 million m3 per year. The El-Hachef dam should allow, because of the storage in the reservoir lake, a continuous supply of the treatment station, to face the forecast demand of the Tangerois region, to avoid the rationing which prevails in summer period, and to provide drinking water to the population, the expanding manufacturing and tourism industry in this region continues. The project consists of seven (07) components, namely: (A) general facilities; (B) civil engineering of the dam; (C) hydro-mechanical equipment; (D) expropriations of land; (E) environmental protection work; (F) logistical support for the project unit; (G) execution studies and works supervision.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data