Barre Road Solar Project
Sector: Road • Location: New Braintree, Massachusetts, United States
Source: AltEnergyMag
A 1.3 MW DC solar farm in New Braintree, Massachusetts, completed using Nexamp's self-performance approach which includes grid modifications and infrastructure upgrades typically performed by the electric utility to speed up project completion and reduce costs.
- Status
- Closed
- Sector
- Road, Solar, Raw Materials, Power Generation (CCGT), Power Transmission
- Location
- New Braintree, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- AltEnergyMag
ConstructChat
Ask ConstructChat about Barre Road Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 1.3 MW DC solar farm in New Braintree, Massachusetts, completed using Nexamp's self-performance approach which includes grid modifications and infrastructure upgrades typically performed by the electric utility to speed up project completion and reduce costs. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | New Braintree |
Source
Source | AltEnergyMag |
URL |
More Details
Record type | Project |
Sector | Road, Solar, Raw Materials, Power Generation (CCGT), Power Transmission |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
