BARRETTS-DILLON
Sector: Bridge • Location: DILLON, Montana, United States of America
Source: Montana Department of Transportation (MDT)
The project on I-15 begins south of the Barretts Interchange (Exit 56) at Mile Post 54.6 and proceeds north 8.7 miles ending at the north bridge end of the Park Street Grade Separation at Mile Post 63.3 The intent of this project is to resurface the roadway. Proposed work includes a seal and cover (chip seal), and updated pavement markings.
- Status
- Prospective
- Sector
- Bridge, Road, Government
- Location
- DILLON, Montana, United States of America
- Updated
- 19 Nov 2026
- Source
- Montana Department of Transportation (MDT)
ConstructChat
Ask ConstructChat about BARRETTS-DILLON
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project on I-15 begins south of the Barretts Interchange (Exit 56) at Mile Post 54.6 and proceeds north 8.7 miles ending at the north bridge end of the Park Street Grade Separation at Mile Post 63.3 The intent of this project is to resurface the roadway. Proposed work includes a seal and cover (chip seal), and updated pavement markings. |
Location
Country | United States of America (USA) |
State | Montana |
City | DILLON |
Source
Source | Montana Department of Transportation (MDT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2024-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
