Barringer Road Improvements and Construction
Sector: Water Supply and Storage • Location: Holly Springs, Mississippi, United States of America
Source: Dodge USA
The work is as follows: the improvement of Barringer Road, beginning at the intersection of the Frontage Road north of Ms. Highway No. 302 and running north to the intersection of Wingo Road, consisting of base, pave, drainage and widening of existing land as per the plans and specifications.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Holly Springs, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Barringer Road Improvements and Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work is as follows: the improvement of Barringer Road, beginning at the intersection of the Frontage Road north of Ms. Highway No. 302 and running north to the intersection of Wingo Road, consisting of base, pave, drainage and widening of existing land as per the plans and specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Holly Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-12-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
